Skip to content
ArcticDedicated

// PERMAFROST-NVMe-123 / Permafrost · Storage

123 TB NVMe storage server

Eight 15.36 TB Gen5 NVMe drives add up to 123 TB of flash, for datasets that need both capacity and millions of IOPS.

PERMAFROST-NVMe-123 · Three-quarter view
Actual chassis ·

32 cores · 64 threads

4.4 GHz boost

384 GB DDR5‑6000

8× 15.36 TB NVMe Gen5

1 Gbps unmetered

2× 1600 W 80 PLUS Titanium

1

Location

Choose the data center. Standard configurations in stock are ready in about 10 minutes, custom builds in 2 to 3 hours.

2

Memory

Every channel is populated with DDR5 ECC, and upgrades cost a fixed price per gigabyte.

3

Storage

4

Network

The first port below is included, together with a private network and always-on DDoS protection.

5

Operating system

We install it automatically, and you can reinstall it or boot your own ISO at any time.

Ubuntu Server LTS
Debian
Rocky Linux
AlmaLinux
Proxmox VE
TrueNAS
FreeBSD
NixOS
Windows Server Standard
Windows Server Datacenter
6

Services and licenses

Licenses

7

Billing term

PERMAFROST-NVMe-123/mo

Configure

What this server is for

Eight 15.36 TB Gen5 NVMe drives add up to 123 TB of flash, for datasets that need both capacity and millions of IOPS.

Permafrost storage servers hold up to twelve 24 TB CMR disks, an NVMe tier for cache or metadata and enough ECC memory for ZFS. When capacity also has to be fast, an all-flash chassis offers 123 TB of Gen5 NVMe.

Ideal for

// Included with this server

  • No setup fee
  • 1 IPv4 and a /56 IPv6
  • Always-on DDoS protection
  • IPMI and iKVM console
  • 100 GB off-site backup
  • 24/7 engineers
  • Price frozen for life
  • Cancel any month

// Specifications

PERMAFROST-NVMe-123

01Cache hierarchy AMD EPYC 9355P
AMD EPYC 9355PSP5 · 8 × CCD
L3 32 MB
L3 32 MB
L3 32 MB
L3 32 MB
I/O die DDR5 × 126000 MT/sPCIe 5.0
L3 32 MB
L3 32 MB
L3 32 MB
L3 32 MB
Cores / threads
32 / 64
L3 cache
256 MB
Boost clock
4.4 GHz
02Memory channels PERMAFROST-NVMe-123

12 channels · 12 × 32 GB DDR5-6000

465 GB/s measured theoretical peak 576 GB/s

81% of the theoretical peak

Type
DDR5-6000
Modules
12× 32 GB
Memory bandwidth
465 GB/s

Processor

Model AMD EPYC 9355P
Architecture Zen 5
Cores / threads 32 / 64
Base / boost clock 3.55 / 4.4 GHz
L3 cache 256 MB
TDP 280 W

Memory

Capacity 384 GB
Type DDR5-6000 ECC RDIMM
Modules 12× 32 GB
Channels 12 of 12 populated

Storage

Drives 8× 15.36 TB NVMe Gen5 · Micron 9550 PRO
RAID Software RAID or ZFS included, MegaRAID optional

Network

Network card NVIDIA ConnectX-6 Lx · 2× 25 GbE SFP28
Public port 1 Gbps unmetered
Private network 25 Gbps
Addresses 1 IPv4 and a /56 IPv6

Chassis & power

Form factor 2U
Power supplies 2× 1600 W 80 PLUS Titanium
Cooling Hot-swap fans, N+1 redundancy

Management

BMC ASPEED AST2600 · IPMI 2.0 · Redfish
Remote access HTML5 iKVM, virtual media, rescue system
Data centers LLA1 · OSL1 · HEL1 · FRA1

Benchmarks of this server

These charts compare this server with the other models of its family on the same test rig, and the raw data is on the benchmarks page.

Single-thread

  1. PERMAFROST-80 3,230
  2. PERMAFROST-192 3,190
  3. PERMAFROST-64 3,180
  4. PERMAFROST-NVMe-123 2,600
  5. PERMAFROST-288 2,540
  6. PERMAFROST-NVMe-61 2,540

Throughput

  1. PERMAFROST-NVMe-123 362,000 MIPS
  2. PERMAFROST-288 192,000 MIPS
  3. PERMAFROST-NVMe-61 192,000 MIPS
  4. PERMAFROST-192 168,000 MIPS
  5. PERMAFROST-80 121,000 MIPS
  6. PERMAFROST-64 96,000 MIPS

Kernel build

  1. PERMAFROST-NVMe-123 31 s
  2. PERMAFROST-288 52 s
  3. PERMAFROST-NVMe-61 52 s
  4. PERMAFROST-192 55 s
  5. PERMAFROST-80 76 s
  6. PERMAFROST-64 98 s

Memory bandwidth

  1. PERMAFROST-NVMe-123 465 GB/s
  2. PERMAFROST-288 230 GB/s
  3. PERMAFROST-NVMe-61 230 GB/s
  4. PERMAFROST-192 64 GB/s
  5. PERMAFROST-64 56 GB/s
  6. PERMAFROST-80 56 GB/s
All results

// FAQ

PERMAFROST-NVMe-123

Answers about dedicated server delivery, bandwidth, hardware and billing.

Talk to an engineer

Our sales engineers answer within one business hour and can size a configuration with you.

Contact sales
How long does delivery take?

If the server is in stock at the location you choose and you keep the standard memory and drives, it is installed automatically and ready about 10 minutes after payment. Changes to memory or drives take 2 to 3 hours, including nights and weekends.

Can I upgrade this server later?

Memory, drives and network options can be added at any time. Each upgrade has its own monthly price, which is frozen just like the server's.

Is the hardware new?

Every server in the main catalog is built from new components and burned in for 72 hours before it goes on sale. Servers that previous customers configured for their own work are sold separately in the outlet.

What happens at the end of my contract?

Monthly contracts renew automatically at the same price. If you cancel, the server stays yours until the end of the paid period, and its drives are then wiped to NIST 800-88.

All questions